Mineral Processing
Project
The deposits from our own mines contain low-grade gold with small or almost no impurities such as carbon and arsenic, as well as high-purity pyrite. In this regard, simple flotation processes can be used for ore dressing to achieve a high gold recovery rate of the concentrate at a reasonable and low processing cost, enabling us to effectively manage and control our operating costs. We have a complete set of beneficiation facilities with an annual beneficiation capacity of approximately 2 million tons, including a factory with a capacity of 6000 tons per day, a tailings dam, and other auxiliary facilities.
The ore dressing plants are located on an industrial site approximately 4 kilometers southeast of the Songjiagou open-pit mine. The factory with a production capacity of 6.0 thousand tons per day was put into operation in May 2011, consisting of a crushing series and two identical grinding flotation series.